May 2, 2012


  1. Thought we had a problem in production (serious but not urgent).
  2. Decided to be fixing in the production branch (although envisioned it would take long which could have been seen as a clear warning).
  3. Changed it substantially (redeploying to a copy of production).
  4. Then the REAL, urgent problem came. And we had out production branch un-deployable to the production.

Should have branched production and worked in the branch from the start.

No comments:

Post a Comment